Serving Pecos, Texas
Water, wastewater & power solutions in Pecos, TX
Alpha Water & Power designs, builds, delivers and supports treatment plants and power systems for projects in Pecos. One team, from engineering through ongoing support.
Water & power in Pecos
What shapes infrastructure projects in Pecos
Pecos is the Reeves County seat on Interstate 20 and the Pecos River, in the heart of the Delaware Basin, one of the most active oil and gas fields in the country. Large data center campuses with dedicated on-site gas generation are now being developed around the city, on top of large produced water volumes and a workforce-housing market that already runs ahead of municipal capacity. Groundwater turns brackish with depth, so desalination, reuse and rapidly deployable wastewater plants are all practical tools here.
Texas combines drought, rapid population growth, a large energy sector and a state water plan that calls for new supply in nearly every region. Alpha Water & Power is headquartered in Garland, Texas, so Texas projects are engineered, built and supported close to home. Alpha Water & Power brings design, equipment, installation and support under one contract, so owners in Pecos can move from concept to a running system without managing a chain of vendors.
Who we work with in Pecos
- Data centers and on-site power
- Oil and gas
- Produced water and midstream
- Workforce housing and camps
- Municipal utilities
- Coverage
- Pecos and Reeves County
- Headquarters
- Garland, Texas
- Regulator
- TCEQ
What we deliver
Solutions for Pecos projects
Ranked for the conditions in this area. Every solution is available as a turnkey scope or as equipment only.
Also available: Permitting and compliance support, Advanced water filtration, Data center and industrial power, ScaleShield water chemistry, LG Chem RO membranes, Support for consulting engineers and public works, DAF, FOG and wastewater recycling.
Design. Build. Deliver. Support.
One team from first sketch to startup in Pecos
- 01
Design
We size the system from your flow, source water and discharge or product-water targets, then price it so you can budget.
- 02
Build
Equipment is fabricated, assembled and tested before it ships, so there are fewer surprises on site.
- 03
Deliver
We handle freight, installation and commissioning, and train your operators.
- 04
Support
Spares, chemistry, membranes and service stay available after startup, from the same team.
Texas compliance
Permitting and regulation in Texas
Treatment and discharge projects in Pecos fall under the Texas Commission on Environmental Quality (TCEQ). Typical approvals include TPDES discharge permits and TCEQ plant design and reuse authorizations. Water rights and supply planning are overseen by the Texas Water Development Board (TWDB).
Our team helps you prepare the process data, design basis and documentation that engineers and regulators need. Read about permitting support.
Funding for Texas projects
Water and wastewater projects in Texas can often be financed through Texas Water Development Board programs, the Texas Water Fund and federal State Revolving Fund loans. Eligibility depends on the owner and project, so confirm with the program before you commit.
Size a system free in AWP LabsQuestions
Water and power projects in Pecos: answers
Does Alpha Water & Power serve Pecos, TX?
Yes. Alpha Water & Power is headquartered in Garland, Texas and designs, builds, delivers and supports water, wastewater and power infrastructure for projects in Pecos and across Texas. Call 800-283-5007 or send the project details through our contact form.
What water and wastewater solutions does AWP offer in Pecos?
For Pecos, the most relevant solutions are mbbr wastewater treatment, turnkey water and wastewater plants, long-duration battery storage and islandable microgrids. Everything is delivered as a turnkey scope or as equipment alone, depending on what your project needs.
What permits does a treatment project in Pecos need?
Texas projects are regulated by the Texas Commission on Environmental Quality (TCEQ). Typical approvals include TPDES discharge permits and TCEQ plant design and reuse authorizations, and local utilities or counties may add their own requirements such as sewer-use limits. Our team helps prepare the technical information your engineer or the permitting authority needs.
Can AWP support data center and high-tech manufacturing projects in Pecos?
Yes. We help with makeup and process water treatment, cooling blowdown and wastewater pretreatment, and with on-site power such as battery storage and islandable microgrids when utility capacity is constrained. Where fresh water is scarce, reverse osmosis can turn brackish groundwater into cooling makeup water. These are planned together so neither water nor power holds up the schedule.
How do I get a quote for a project in Pecos?
Send the flow, source water, discharge or product-water targets, site location and timeline using the form on this page, or call 800-283-5007. An AWP engineer will come back with a design, a price and a schedule. Texas projects may also qualify for funding through Texas Water Development Board programs, the Texas Water Fund and federal State Revolving Fund loans.
Headquartered in Garland, Texas. Send the flow, source water, discharge limits and timeline for your Pecos project and an AWP engineer will reply with a design, a price and a schedule.
Nearby Texas areas
- Water & power solutions in Fort Stockton, TX
- Water & power solutions in Van Horn, TX
- Water & power solutions in Odessa, TX
- Water & power solutions in Midland, TX
- Water & power solutions in Garland, TX
- Water & power solutions in Dallas, TX
- Water & power solutions in Fort Worth, TX
- Water & power solutions in Plano, TX





